Vestas 4 MW

Enhance Vestas 4 MW operations through collaboration with your peers

14 Nov from 12:00 to 14:50

Introduction

The Vestas 4 MW user group is one of our most prominent user groups. Our dear members have been hit by a lot of issues with their main bearings, blade bearings and gearboxes. Serial defects, IP battles, and ugly failure rates are often included in our discussions.

Your moderator for this roundtable

Teemu Vekkeli, Wind Energy Specialist at Eurus Energy

Eurus Energy develops and operates renewable assets worldwide. Eurus operates a +3 GW multi-technology wind portfolio. Usually, these turbine-specific owners' meetings are hosted by O2O WIND, but we have asked our dear members to help us in Madrid.

A big thank you to Eurus Energy!

Join our Vestas 4 MW operators

We have invited the 21 energy companies listed below who are collaborating within our Vestas 4 MW user group, to Madrid. Among themselves, they own 1227 Vestas 4 MW turbines. This roundtable will include the following turbine models: V105-3.45 MW, V112-3.45 MW, V117-3.45 MW, V117-4.2 MW, V126-3.45 MW, V136-3.45 MW, V136-4.2 MW, V136-4.5 MW, V150-4.2 MW, V150-4.5 MW, V155-3.6 MW and V163-4.5 MW.

They are, of course, interested in including more Vestas 4 MW operational know-how in the group. On the Owners Roundtable 2024, we then offer the opportunity for non-members who own Vestas 4 MW turbines to join a session of Vestas 4 MW owner-2-owner collaboration.

Vestas 4 MW challenges

Are these the kind of challenges you are expected to solve for your Vestas 4 MW operations?

  • Line Side Breaker Fault

  • PT100 Sensor Issues

  • Rotor Locking Pins

  • Uprating of the single power unit

  • Torque arm bushing failure

  • Hydraulic oil leak in the hub

  • Gearboxes in the wet sump

  • Underperforming PC at the upper knee

  • Debonding of blade shells

  • LPS 2 major issues

  • Yaw teeth lubrication

  • Defective yaw motors from ABB

  • Converter troubleshooting

  • Hydraulic hoses that are “sweating.”

Joining this discussion with your Vestas 4 MW peers will give you a broader understanding, an expanded network and valuable insights.

Your top challenge – directly included

This roundtable is based on real and current challenges held among the participants. You will have direct input on your top challenge and insights into your peer’s top challenges.

  1. Before the event - submit your top challenge.

  2. At the event - discover your peers' challenges, have input on yours and discuss solutions.

  3. After the event - receive a summary of the findings from all roundtables, providing valuable insights for all.

Once you have registered your team, each individual will receive a link to select roundtables and submit their top challenges. A dummy is shown at this link.